EICR Report for Industrial Facility

EICR Report for Industrial Facility

Our Customer’s Challenge

Our client’s site is a large industrial plant in North Manchester, manufacturing high specification cables for UK and global clients. The facility’s Electrical Installation Condition Report (EICR) proving the compliance of all the sites electrical installations and circuits in addition to the more complex installations for all power equipment to current safety regulations, required renewal.


As the site is operational 24/7 the challenge was to undertake all necessary works without interruption to productivity. Due to the size and complexity of the site a contractor who has extensive knowledge in planning and executing LV works without compromising productivity, safety, quality, or client interaction was required.

 

The Quartzelec Solution

Quartzelec has been successfully providing services to this particular site for a number of years and have become a trusted and embedded contractor for electrical services including LV switchgear maintenance, installation services as well as EICR.


Applying our knowledge of the LV system and site we were able to successfully plan and execute the required EICR works. Working in tandem with the client’s Production Managers, Lead Foremen as well as the dedicated Engineering team.

 

Key Benefits

Working hard to develop a great working relationship with trust from both partners ensures a competent and expert delivery in line with the customer’s immediate requirements: 

  • Planned isolation schedule
  • Close working relationship with client
  • Cost savings to client
  • Extensive site knowledge
  • Completed under programmed timescale

 

 

DOWNLOAD CASE STUDY PDF

 

 

#UnparalleledInEngineeringServices

Follow us on FacebookX & LinkedIn

 

 CS83

Connect with us